Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs

摘要:

文章预览

A Finite Capacity Planning Policy (FCPP) is developed for multiple color filter (CF) fabs where each fab has several identical production lines. FCPP assigns customer orders to multiple fabs and multiple lines by taking into account each fab’s available capacity and Work-In-Process (WIP) level, as well as each order’s batch size, product type, process routing, and processing time. After all orders are assigned to fabs and lines, order release time and finish time are determined by the implementation of several modules. FCPP is developed in Microsoft Visual Basic for Application (VBA), and an AutoMod simulation model is also developed. A company with two CF fabs and two lines at each fab is treated as a case study, and industrial data from these fabs are collected and used to evaluate the performance of FCPP based on the design of experiments. Preliminary simulation results show that FCPP can effectively and efficiently balance the loading between fabs and also balance the loading between lines in each fab.

信息:

期刊:

编辑:

Daizhong Su, Qingbin Zhang and Shifan Zhu

页数:

637-640

DOI:

10.4028/www.scientific.net/KEM.419-420.637

引用:

J. C. Chen et al., "Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs", Key Engineering Materials, Vols. 419-420, pp. 637-640, 2010

上线时间:

October 2009

输出:

价格:

$35.00

[1] J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, Effective Order Release and Dispatching for Color Filter Fabs, Society for Information Display International Symposium, San Antonio, Texas, USA (2009).

DOI: 10.1889/1.3256538

[2] J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, M. T. Chiang, Infinite Capacity Planning for Color Filter Fabs, International Display Manufacturing Conference, Taipei, Taiwan (2009).

DOI: 10.1889/1.3256538

[3] J. C. Chen, Y. C. Fan, and C. W. Chen, Capacity Requirements Planning for Twin Fabs of Wafer Fabrication, International Journal of Production Research (2008), First Published on 30 April (2008).

DOI: 10.1080/00207540802007597

[4] J. T. Lin, F. K. Wang, and C. C. Peng, Lot release times and dispatching rule for a TFT-LCD cell process, Robotics and Computer-Integrated Manufacturing, Vol. 24 (2008), pp.228-238.

DOI: 10.1016/j.rcim.2006.10.006

[5] F. K. Wang, T. Du and F. C. Wen, Product Mix in the TFT-LCD Industry, Production Planning and Control, Vol. 18 (2007), pp.584-591.